< Home < Back

Tata Power synchronizes 67.5 MW Unit 1 of its 202.5 MW IEL Kalinganagar-Orissa project

Date: 04-02-2016

Tata Power, India's largest integrated power company, through its joint venture company Industrial Energy (IEL), has synchronized the 67.5 MW Unit 1 of its 3 x 67.5 MW IEL Kalinganagar project. These units are designed to cater to the requirement of LP steam, which is supplied to Tata Steel, which got commissioned from December, 2015. The IEL Kalinganagar project is the 2nd unit of IEL after PH #6 IEL Jamshedpur based on the mixture of BFG, COG, and LDG, which is environment friendly and efficient.

Tata Power is India’s largest integrated power company with a growing international presence. The company together with its subsidiaries and jointly controlled entities has an installed gross generation capacity of 8,669 MW and a presence in all the segments of the power sector.