NTPC Ltd.

BSE: 532555 | NSE: NTPC
Large Cap | Power Generation/Distribution
346.25
-2.90 (-0.83%)
< Home < Back

NTPC to execute 3 big hydel projects in Uttarakhand

Date: 19-03-2012

NTPC is likely to execute three big hydel projects with a total capacity of 942 MW in Uttarakhand. The three projects are Tapovan Vishnugad (520 MW), Rupsiyabagar-Khasiabara (261 MW) and Lata Topovan (171 MW) in the hill state. 

The company chose Uttarakhand as it will be getting 12% of free power which is equal to 300 million units. Other benefits like local area development, enhancement of life of bonafides and income generation will also be given. It has completed more than 60% of the tunnel work of Tapovan project.

The entity has also relocated two temples in the area successfully. As part of the government policy, it is also planning to provide power to the rural population in the radius of 5 km from the project.