NTPC Ltd.

BSE: 532555 | NSE: NTPC
Large Cap | Power Generation/Distribution
346.25
-2.90 (-0.83%)
< Home < Back

NTPC commissions Unit-IV of 500 MW of Simhadri Super Thermal Power Project

Date: 30-03-2012

National Thermal Power Corporation (NTPC) has commissioned Unit-IV of 500 MW of Simhadri Super Thermal Power Project on March 30, 2012. With this, the total capacity of NTPC group has become 37,014 MW.

Recently, NTPC’s joint venture (JV) - NTPC Tamil Nadu Energy Company had commissioned Unit I of 500 MW of Vallur Thermal Power Project on March 28, 2012.

At present, the company operates seven gas-based projects in the country --  413 MW Anta (Rajasthan), 652 MW Auraiya (Uttar Pradesh), 645 MW Kawas (Gujarat), 817 MW Dadri (Uttar Pradesh), 648 MW Jhanor-Gandhar (Gujarat), 350 MW Kayamkulam (Kerala) and 430 MW Faridabad (Haryana)-- with a total capacity of 3,955 MW.