-0.50 (-0.14%) In line with the Corporate Disclosure requirements, NTPC has informed that 25 MW of Bhadla Solar Power Project of the company has been commissioned. With this, the installed capacity of Bhadla Solar Power project has become 185 MW and that of NTPCs solar power projects has become 545 MW. The total installed capacity of NTPC on standalone basis has become 41247 MW and that of NTPC group has become 48213 MW.
The above information is a part of company’s filings submitted to BSE.