-3.05 (-0.88%) In line with the Corporate Disclosure requirements, NTPC has informed that 2nd Unit of 250 MW of Bongaigaon Thermal Power Project (3 X 250 MW) has been commissioned. With this, the commissioned capacity of Bongaigaon Thermal Power Project, NTPC and NTPC group has become 500 MW, 42177 MW and 49143 MW respectively.
The above information is a part of company’s filings submitted to BSE.