1.45 (0.42%) In line with the Corporate Disclosure requirements, NTPC has informed that 55 MW of Bhadla Solar Power Project of the Company has been commissioned. With this, the installed capacity of Bhadla Solar Power project has become 260 MW and that of NTPC's solar power projects has become 620 MW. The total installed capacity of NTPC on standalone basis has become 43032 MW and that of NTPC group has become 49998 MW.
The above information is a part of company’s filings submitted to BSE.