NTPC Ltd.

BSE: 532555 | NSE: NTPC
Large Cap | Power Generation/Distribution
350.40
4.80 (1.39%)
< Home < Back

NTPC gains on commissioning Unit 2 of 250 MW of BRBCL

Date: 05-04-2017

NTPC is currently trading at Rs. 167.10, up by 2.35 points or 1.43% from its previous closing of Rs. 164.75 on the BSE.

The scrip opened at Rs. 165.00 and has touched a high and low of Rs. 167.20 and Rs. 165.00 respectively. So far 15,000 shares were traded on the counter.

The BSE group 'A' stock of face value Rs. 10 has touched a 52 week high of Rs. 177.80 on 27-Jan-2017 and a 52 week low of Rs. 125.05 on 07-Apr-2016.

Last one week high and low of the scrip stood at Rs. 167.20 and Rs. 162.45 respectively. The current market cap of the company is Rs. 1,37,864.00 crore.

The promoters holding in the company stood at 69.74%, while Institutions and Non-Institutions held 28.13% and 2.12% respectively.

NTPC has commissioned Unit 2 of 250 MW of Bhartiya Rail Bijlee Company (BRBCL) on April 3, 2017. BRBCL is a subsidiary of the company. Further, NTPC has also commissioned its first wind turbine of 2 MW at Rojmal Wind Power Project (50 MW). With this, the commissioned capacity of NTPC and NTPC Group has become 43534 MW and 50750 MW respectively.

NTPC is an Indian central Public Sector Undertaking (PSU) under the Ministry of Power, Government of India, engaged in the business of generation of electricity and allied activities.