4.80 (1.39%) In continuation of the disclosure dated 02.06.2017, NTPC has informed that 225 MW out of 250 MW of Mandsaur Solar Power Project of the Company has been commissioned. With this, the installed capacity of NTPCs solar power projects has become 845 MW. The total installed capacity of NTPC on standalone basis has become 44419 MW and that of NTPC group has become 51635 MW.
The above information is a part of company’s filings submitted to BSE.