NTPC Ltd.

BSE: 532555 | NSE: NTPC
Large Cap | Power Generation/Distribution
350.40
4.80 (1.39%)
< Home < Back

NTPC informs about company updates

Date: 02-04-2018

In line with the Corporate Disclosure requirements, NTPC has informed that 1st unit of 660 MW of Meja Thermal Power Project (2x660 MW) of Meja Urja Nigam (a JV company of NTPC) has been commissioned on 31.03.2018.  With this, the total commissioned capacity of NTPC group has become 53651 MW.

The above information is a part of company’s filings submitted to BSE.