-2.70 (-0.07%) AIA Engineering has started commercial production under Second Phase of its Greenfield Project at GIDC, Kerala in Gujarat. The installed capacity under the Second Phase is 50,000 Mt per year. With this expansion, the total installed capacity of wear parts of the Group will be augmented from 340,000 Mt to 390,000 Mt per year.
AIA Engineering is engaged in the business of designing, developing, manufacturing, installing and servicing of high chromium wear, corrosion and abrasion resistant parts.