NTPC Ltd.

BSE: 532555 | NSE: NTPC
Large Cap | Power Generation/Distribution
367.30
8.75 (2.44%)
< Home < Back

Government allocates Badam coal block to NTPC

Date: 11-09-2019

NTPC has been allocated Badam coal block in Jharkhand by Ministry of Coal following the acquisition of Barauni thermal plant. The Ministry of Coal has transferred the Badam coal block, located in Jharkhand, to the NTPC, on September 2, 2019. The Badam coal block was earlier allocated to Bihar State Power Generation Company (BSPGCL).

NTPC is the largest power utility company in India and has presence in Coal, Gas, Solar PV, Hydro and Wind Power Generation and Coal Mining.