1.00 (0.03%) Larsen & Toubro’s (L&T) building business has set a record by constructing the 7 storey, state-of-the-art Flight Control System (FCS) Integration Facility for the Defence Research and Development Organization (DRDO) in just 45 days using Integrated Hybrid Modular Construction Technology (IHMCT). A significant development to modernize and enhance the strategic capabilities of the Indian Defence, the facility is the result of L&T's unique integrated off site and on site construction approach.
Constructed on a total built-up area of 130,000 sq. feet, the site team had to coordinate with 21 off-site locations to integrate design, structure, architecture, and MEP services. Going forward, this hybrid construction system developed by L&T will help increase productivity, optimize resource utilization, reduce losses due to wastage and speed up pace of construction.
L&T is an Indian multinational engaged in technology, engineering, construction, manufacturing and financial services.