JSW Energy Ltd.

BSE: 533148 | NSE: JSWENERGY
Mid Cap | Power Generation/Distribution
550.10
-15.35 (-2.71%)
< Home < Back

JSW Energy commissions 85 MW of renewable energy capacity

Date: 10-11-2025

JSW Energy has successfully commissioned 85 MW of renewable energy capacity, with solar capacity of 74 MW (Including part of NHPC Hybrid Project) and wind capacity of 11 MW taking the installed capacity to 13,295 MW. The share of renewables in the overall capacity stands at 57% constituting wind capacity at 3,720 MW, solar capacity at 2,286 MW and hydro capacity at 1,631 MW.  

JSW Energy has total locked-in generation capacity of 30.5 GW comprising of 13.3 GW operational, 12.5 GW under-construction across thermal and renewable, 150 MW under acquisition hydro and has pipeline of 4.6 GW. The company also has 29.4 GWh of locked-in energy storage capacity through hydro pumped storage projects of 26.4 GWh and battery energy storage system of 3.0 GWh. The Company aims to reach 30 GW generation capacity and 40 GWh of energy storage capacity by FY 2030 and achieve Carbon Neutrality by 2050.

JSW Energy, part of the JSW Group, is a growing energy company. The Group has diversified interests in carbon steel, power, mining, industrial gases, port facilities, aluminium, cement and information technology.