Manali Petrochemicals resumes operations at both of its Plants

04 Jan 2016 Evaluate

Manali Petrochemicals has resumed operation at its Plant 1 and the production is being ramped up to the full levels. Production at Plant 2, which was being operated since the second week of December 2015 at a lower load with the available material has also been scaled up with resumption of Propylene supplies by CPCL to both the Plants.

In all, Plant 1 remained shut-down for 27 days and Plant 2 for 18 days. In order to minimize the impact of the closure, actions have been taken to scale up the production to the maximum extent possible in the coming months. The company has adequate Industrial All Risks cover including for loss of profits. The company’s production at both the Plants remained affected since December 02, 2015 due to flooding and the resultant power disruptions.

Manali Petrochemicals (MPL) is a leader in the production and marketing of Propylene Oxide, Propylene Glycols and Polyols in India. The Company operates two grassroot production facilities at Manali to manufacture Propylene oxide (PO), Propylene Glycol (PG) and Polyols.

Manali Petro Share Price

61.64 -0.97 (-1.55%)
05-Dec-2025 16:59 View Price Chart
Peers
Company Name CMP
BASF India 4039.90
Tata Chemicals 773.85
SRF 2886.20
Pidilite Inds. 1474.70
Deepak Nitrite 1565.30
View more..
Register Now to get our Free Newsletter & much more!

© 2025 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.

×