INOX Wind has signed a Term Sheet with Continuum Power Trading (TN), part of Continuum Wind Energy group, to supply, erect and commission 250 MW of wind power projects (in two phases of 126 MW and 124 MW) comprising of a mix of 2 MW (113 metre rotor diameter turbine combined with 92 metre hub height) and 3 MW (145 metre rotor diameter turbine combined with 120 metre hub height) turbines.
The first phase of 126 MW of the project is scheduled to be commissioned by Q3 of FY 2021 at Dayapar, District Bhuj in the State of Gujarat and will be executed on a turnkey project basis.
INOX Wind offers its clients total wind power solutions including wind resource assessment, acquiring land, developing the entire site infrastructure, building the power evacuation system, supplying the WTGs, erection and commissioning services, long term operations and maintenance services as well as post-commissioning support.