Titagarh Rail Systems has received Letter of Acceptance (LoA) from NCC for ‘Design, Manufacture, Supply, Installation, Integration, Testing and Commissioning of Rolling Stock (18 trains of 6 cars each to taking to 108 metro coaches) including 5 years of Comprehensive Maintenance after 2 years of Defect Liability Maintenance Period of Line 6 [Swami Samarth Nagar to Vikhroli (EEH)] of Mumbai Metro Rail Project of Mumbai Metropolitan Region Development Authority (MMRDA). The order value is about Rs 1598.55 crore.
Titagarh Rail Systems is formerly known as Titagarh Wagons. The company is mainly engaged in the manufacturing and selling of Freight Wagons, Passenger Coaches, Steel Castings, Specialised Equipments & Bridges, Ships, Heavy Earthmoving and Mining Equipments, etc.