Juniper Green Energy’s wholly owned subsidiary -- Juniper Green Spark Ten has fully commissioned the 75 MW wind solar hybrid power project with the commissioning of the final 10 MW wind capacity at the project site on September 09, 2026. The commissioning has been witnessed and confirmed by Maharashtra State Electricity Distribution Company (MSEDCL) officials, and the formal certificate is expected to be issued shortly. Pursuant to the commissioning of the above capacity, the aggregate operational capacity of Juniper Green Energy and its subsidiaries stands at around 2,604 MWp and around 500 MWh BESS as of the date hereof.
Takyon Networks has received a work order worth of Rs 1.78 crore from Northern Railway, Lucknow for the purpose of Augmentation & Upgradation of Last Mile Connectivity of CMS at Various Stations over Lucknow Division, Northern Railway.
Dilip Buildcon has been selected as the successful for securing LOI for Grant of Authorization for Laying, Building, Operating or Expanding Petroleum and Petroleum Product (LPG) Pipeline from Paradip, Odisha to Raipur, Chattisgarh. The Project Authority is Petroleum and Natural Gas Regulatory Board (PNGRB). The Project entails the grant of an exclusive license by PNGRB to act as the authorized entity for the development of pipeline infrastructure for the transportation of LPG, including financing, construction, and operation of the same, and to levy and collect tariff for the transportation of LPG up to the designated delivery point for operation period of 25 years after construction period of 3 years.
Enviro Infra Engineers (EIEL) through its Step Down Subsidiary Suyog Urja (SUL), has received a Letter of Intent (LOI) from Tata Power Renewable Energy (TPREL) for the execution of EPC turnkey works for the development of a 180 MW NTPC Wind Power Project at Parli, Maharashtra. The LOI has a contract value of Rs 224.19 Crore (including GST) and is to be executed by 31st March 2027.
Shakti Pumps (India) has received a Letter of Empanelment from Maharashtra State Electricity Distribution Company for 10,000 Off-Grid Solar Photovoltaic Water Pumping Systems (SPWPS) pumps of 3 HP, 5 HP, 7.5 HP for the entire state of Maharashtra under Magel Tyala Saur Krushi Pump Yojana. The total value of the 10,000 pumps is around Rs 235.92 crore (inclusive of GST) which is to be executed within 60 days from the issuance of work order/NTP.
Niyogin Fintech is planning to enter into a potential strategic partnership with Sammaan Capital, under which Sammaan will explore extending credit facilities and undertake periodic portfolio buyouts from the company. Niyogin and Sammaan intend to build together a portfolio of up to Rs 500 crore over the course of the next 36 months as the company scales credit delivery through its embedded distribution network across rural and urban India. This understanding is non-binding, subject to mutual agreement, may be revised from time to time, and is subject to regulatory approvals and definitive agreements.
Kama Holdings has received Board approval and entered into a Share Subscription Agreement with its wholly owned subsidiary, KAMA Realty (Delhi) (KRDL), pursuant to which the Company shall subscribe to 1,17,000 equity shares to be issued by KRDL on a private placement basis in one or more tranches. The proposed infusion of Capital by KAMA Holdings into KAMA Realty (Delhi) will not result in any change in the control, management or ultimate beneficial ownership of KAMA Realty (Delhi) and it will continue to remain the wholly owned subsidiary of KAMA Holdings. The Board of Directors of the company, at its meeting held on September 9, 2026, has approved the same.