International Energy Agency (IEA), in its report tilted ‘the India Renewable Energy Market Report 2026’, has said that India's renewable power capacity has almost quadrupled over the past decade, crossing 300 gigawatts (GW) in 2026, making it the world's second-fastest-growing renewables market and the second-largest manufacturer of solar photovoltaic (PV) modules. It added that India has achieved its target of 50% non-fossil fuel-based installed power capacity in 2025, five years ahead of schedule. Highlighting the significance of the renewable power capacity expansion, it noted that the expansion is delivering measurable economic and energy security benefits. It added that renewable electricity generation has helped India avoid more than $100 billion in coal and natural gas import costs between 2011 and 2025. Cumulative savings are expected to more than double by 2030.
Going forwards, it expects India's renewable power capacity to reach around 530 GW by 2030, with solar PV accounting for more than 80% of additions. The expansion would further strengthen the country's non-fossil power capacity base, although meeting its longer-term ambitions will require continued investment in supporting infrastructure. It also highlighted that India's renewables expansion is delivering major benefits for its energy security at a time of heightened uncertainty in global energy markets. It noted that India's experience shows how consistent policies can help drive down renewable energy costs and attract investment, offering valuable lessons for other emerging economies.
In spite of strong expansion, it noted that the next phase of India's renewable energy transition will depend increasingly on its ability to integrate intermittent renewable generation into the electricity system. It has identified inadequate grid infrastructure, limited energy storage and insufficient system flexibility, alongside the financial health of electricity distribution utilities and project execution delays, as key challenges that could constrain deployment. Meanwhile, it said that faster investment in transmission networks, storage capacity and system flexibility, together with improvements in utility finances and fewer project delays, could accelerate renewable power capacity deployment by more than 20% during 2026-2030.