Sadbhav Engineering has been declared the successful bidder (LI) in respect of the bid invited by National Highways Authority of India (NHAI) (Ministry of Road Transport and Highways) for the two projects for continuous stretch of 86.36 km for aggregating value of Rs 904.50 crore.
The first project is for 4-laning of UP/Haryana border- Yamunanagar-Saha-Barvvala- Panchkula Section of NH- 73 from km70.830 to km 115.400 in the state of Haryana on EPC mode. The construction period for 44.570 km stretch is 2.5 years at an estimated cost of Rs 468.00 crore. The second project is for 4-laning of UP/Haryana border- Yamunanagar-Saha-Barwala- Panchkula Section of NH-73 from km 115.400 to km 157.192 in the state of Haryana on EPC mode. The construction period for 41.792 km stretch is 2.5 years at an estimated cost of Rs 436.50 crore.
Sadbhav Engineering (SEL) is one of the largest BOT developers in the road sector in India with good project execution skills. SEL operates in the four distinct business areas in the infrastructure sector viz. BOT road projects, cash contract-based road projects, irrigation projects and mining.