Gujarat Industries Power Company (GIPCL) has commissioned two more Wind Turbine Generators (WTGs) of 1.5 MW each located at the Kotadapitha Wind Farm Site, Amreli district, in Gujarat for which Certificate of Commissioning has been issued by Gujarat Energy Development Authority (GEDA). Accordingly, the total capacity of Kotadapitha Site is 15 MW (10 WTGs x 1.5 MW).
Besides, on account of financial constraints faced by Leitwind Shriram Manufacturing (LSML), Chennai, the EPC Contractor, the said 27 MW Kotadapitha Wind Farm Site has been downsized and truncated at 15 MW (1.5 MW x 10 WTGs). Accordingly, the Alteration/Variation Order (AVO) dated November 22, 2016 for the downsized capacity has been issued by GIPCL to the EPC Contractor.
GIPCL is engaged in business of Electrical Power Generation. The company has a vision to transform itself into a national level power sector enterprise.
| Company Name | CMP |
|---|---|
| NTPC | 393.65 |
| Tata Power | 427.45 |
| Adani Power | 198.40 |
| Power Grid Corp | 318.05 |
| Torrent Power | 1565.30 |
| View more.. | |
MoneyWorks4Me is a SEBI-registered Investment Adviser (IA) dedicated to helping investors build long-term wealth through transparent, research-driven, conflict-free guidance. Founded in 2008, we started our journey as a Research Analyst (RA), providing deep fundamental analysis, intrinsic value insights, and long-term investing frameworks for Indian equities. In 2017, we transitioned to a full-fledged SEBI-registered Investment Adviser, strengthening our commitment to acting as a fiduciary—always putting the investor’s interest first.
To become India’s most trusted, research-powered fiduciary advisory platform—where every investor, regardless of experience, can make calm, confident, and well-reasoned investment decisions.
MoneyWorks4Me ensures this through: