GIPCL commissions two more WTGs of 1.5 MW each at Kotadapitha Wind Farm Site

14 Feb 2017 Evaluate

Gujarat Industries Power Company (GIPCL) has commissioned two more Wind Turbine Generators (WTGs) of 1.5 MW each located at the Kotadapitha Wind Farm Site, Amreli district, in Gujarat for which Certificate of Commissioning has been issued by Gujarat Energy Development Authority (GEDA). Accordingly, the total capacity of Kotadapitha Site is 15 MW (10 WTGs x 1.5 MW).

Besides, on account of financial constraints faced by Leitwind Shriram Manufacturing (LSML), Chennai, the EPC Contractor, the said 27 MW Kotadapitha Wind Farm Site has been downsized and truncated at 15 MW (1.5 MW x 10 WTGs). Accordingly, the Alteration/Variation Order (AVO) dated November 22, 2016 for the downsized capacity has been issued by GIPCL to the EPC Contractor.

GIPCL is engaged in business of Electrical Power Generation. The company has a vision to transform itself into a national level power sector enterprise.

Guj. Inds. Power Share Price

150.50 2.35 (1.59%)
15-Dec-2025 16:59 View Price Chart
Peers
Company Name CMP
NTPC 323.85
Tata Power 381.60
Adani Power 144.40
Power Grid Corp 262.30
Torrent Power 1290.90
View more..
Register Now to get our Free Newsletter & much more!

© 2025 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.

×