MoneyWorks4Me

Alufluoride to set up solar power project for captive consumption

06 Jul 2017 Evaluate

Alufluoride has decided to set up 600kwp DC solar power project at factory premises for captive consumption at an estimated cost of Rs 2.7 crore. The installation is expected to be completed by September 30, 2017.

Alufluoride is engaged in producing Aluminium Fluoride and related products. The Company's Aluminium Fluoride is produced with a technology by reacting dry Alumina Hydrate with Hydro-fluosilicic acid, which is generated from the fluorine recovery unit of the adjoining fertilizer complex.

Peers
Company Name CMP
Godrej Industries 952.65
SRF 2337.00
BASF India 3188.30
Pidilite Inds. 1470.00
Tata Chemicals 594.05
View more..