MoneyWorks4Me

Patel Engineering bags new order of Rs 1564.42 crore

27 Oct 2020 Evaluate

Patel Engineering has bagged order of Rs 1564.42 crore for Subansiri Lower Hydro Electric Project (2,000 MW), Arunachal Pradesh. Subansiri Lower HEP is having installed capacity of 2000 MW which will be a single largest hydro power generation project in India. 

The company has been able to get this project and even mobilize the same during this Covid-19 Pandemic. The project is located at Village Kolaptukar in Kamle (formerly Lower Subansiri) district of Arunachal Pradesh.  

Patel Engineering provides a wide range of civil engineering services involved in design and construction of power projeccts, hydroeletric projects, commercial building, industrial complexes, dams, tunnels, underground structures, steel and concrete structures, bridges, marine works, flyovers and national highways in India and abroad.

 

 

Peers
Company Name CMP
Larsen & Toubro 3845.00
Kalpataru Projects 1397.60
NCC 133.45
Rail Vikas Nigam 207.00
KEC International 395.45
View more..