Patel Engineering bags new order of Rs 1564.42 crore

27 Oct 2020 Evaluate

Patel Engineering has bagged order of Rs 1564.42 crore for Subansiri Lower Hydro Electric Project (2,000 MW), Arunachal Pradesh. Subansiri Lower HEP is having installed capacity of 2000 MW which will be a single largest hydro power generation project in India. 

The company has been able to get this project and even mobilize the same during this Covid-19 Pandemic. The project is located at Village Kolaptukar in Kamle (formerly Lower Subansiri) district of Arunachal Pradesh.  

Patel Engineering provides a wide range of civil engineering services involved in design and construction of power projeccts, hydroeletric projects, commercial building, industrial complexes, dams, tunnels, underground structures, steel and concrete structures, bridges, marine works, flyovers and national highways in India and abroad.

 

 

Patel Engineering Share Price

65.03 0.66 (1.03%)
25-Apr-2024 16:01 View Price Chart
Peers
Company Name CMP
Larsen & Toubro 3650.65
Rail Vikas Nigam 287.05
KEC International 732.95
Kalpataru Projects 1180.00
NCC 246.75
View more..
© 2024 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt.Ltd.