SJVN has bagged an order from the Government of Himachal Pradesh. The Government of Himachal Pradesh in its cabinet meeting has decided to allot 104 MW Tandi, 130 MW Rashil and 267 MW Sach Khas hydro-electric projects (total 501 MW) on Chenab Basin in Himachal Pradesh to SJVN.
SJVN is engaged in hydroelectric power generation originally established as a joint venture between the government and the state government of Himachal Pradesh to develop and operate the Nathpa Jhakri Hydro Power Station (NJHPS).