Ashoka Buildcon has received a Letter of Award (LoA) from Gujarat Rail Infrastructure Development Corporation (G-RIDE) for the Project viz ‘Gauge Conversion of Bechraji (63.83 KM) - Ranuj (101.983 KM) Section, Total Length of 38.153 KM Metre Gauge to Broad Gauge with 25 KV AC Electrification in Ahmedabad Division of Western Railway’. The accepted project cost is approximately Rs 334 crore.
Ashoka Buildcon builds and operates roads and bridges in India on a build, operate and transfer (BOT) basis. It currently operates one of the highest numbers of toll-based BOT projects in India.