Rail Vikas Nigam has secured contract from Madhya Pradesh Metro Rail Corporation for design and construction of elevated viaduct between Ch. 14+488 and Ch. 25+415, viaduct connecting depot leading upto interface location, Nine elevated metro rail stations including all Civil, Structural, Roof Structure, Mechanical, Electrical and Plumbing (MEP) works, Architectural finishes, Facade, Entry / Exits, FOB, Viaduct within the stations including transition spans for Indore Metro Rail project Yellow Line. The total contract amount is Rs 1034.90 crore.
Rail Vikas Nigam is in the business of executing all types of railway projects including new lines, doubling, gauge conversion, railway electrification, metro projects, workshops, major bridges, construction of cable stayed bridges, institution buildings etc.