Tata Power’s arm commissions 300 MW project in Gujarat

04 Apr 2022 Evaluate

Tata Power’s 100 percent subsidiary -- Tata Power Renewable Energy has commissioned a 300 MW project in Dholera, Gujarat. It is India’s largest single-axis solar tracker system. The project will generate 774 MUs annually. Along with this, it will reduce approximately 704340 MT/year of carbon emission.

The installation entails 873012 numbers of Monocrystalline PV Modules. The project was commissioned well within the stipulated timeline. Despite the various COVID-19 challenges faced by the industry, TPREL through Tata Power’s EPC arm Tata Power Solar Systems has successfully completed the project within the project timelines due to its excellent project execution capabilities and experience. Tata Power managed customized installation, basis the geographical locations and land conditions. The total area used for the installation is 1320 Acre divided into six different plots of 220 acres each.

Tata Power Company is India’s largest integrated power company.

Tata Power Share Price

379.95 -1.65 (-0.43%)
16-Dec-2025 16:59 View Price Chart
Peers
Company Name CMP
NTPC 321.00
Tata Power 379.95
Adani Power 145.30
Power Grid Corp 260.45
Torrent Power 1281.30
View more..
Register Now to get our Free Newsletter & much more!

© 2025 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.

×