NTPC surges on starting commercial operation of last part capacity of Kayamkulam Floating Solar PV Project

24 Jun 2022 Evaluate

NTPC is currently trading at Rs. 136.60, up by 0.25 points or 0.18% from its previous closing of Rs. 136.35 on the BSE.

The scrip opened at Rs. 136.95 and has touched a high and low of Rs. 137.75 and Rs. 135.00 respectively. So far 235156 shares were traded on the counter.

The BSE group 'A' stock of face value Rs. 10 has touched a 52 week high of Rs. 166.30 on 19-Apr-2022 and a 52 week low of Rs. 111.95 on 26-Aug-2021.

Last one week high and low of the scrip stood at Rs. 141.40 and Rs. 135.00 respectively. The current market cap of the company is Rs. 131874.66 crore.

The promoters holding in the company stood at 51.10%, while Institutions and Non-Institutions held 45.67% and 3.23% respectively.

NTPC has started Commercial Operation of last part capacity of 35 MW out of 92 MW Kayamkulam Floating Solar PV Project at Kayamkulam, Kerala with effect from June 24, 2022.

With this, standalone installed and commercial capacity of NTPC has become 54749.20 MW, while group installed and commercial capacity of NTPC has become 69114.20 MW.

NTPC is the largest power utility company in India and has presence in Coal, Gas, Solar PV, Hydro and Wind Power Generation and Coal Mining.

NTPC Share Price

344.80 1.30 (0.38%)
20-Jan-2026 11:15 View Price Chart
Peers
Company Name CMP
NTPC 344.80
Tata Power 360.25
Adani Power 140.15
Power Grid Corp 256.80
Torrent Power 1335.70
View more..
Register Now to get our Free Newsletter & much more!

© 2026 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.

×