Reliance Metro’s Airport Express Line to resume commercial operations on Jan 22

21 Jan 2013 Evaluate

Reliance Infrastructure’s Delhi Airport Metro Express (DAMEPL) would be resuming commercial operations at its regular timing of 5:30 am from January 22, 2013, after being shut for six months. Reliance Metro’s Airport Express Line would run daily from 5.30 am to 11.30 pm at a frequency of 15 minutes.

Although, Reliance Metro’s Airport Express Line is connected directly to Terminal-3, passengers arriving at or boarding flights from Terminal-1 can also avail this service from Aerocity Station. Reliance Metro has made arrangements to provide seamless connectivity for Terminal-1 passengers to Aerocity Station through shared cab and shuttle bus services.

Facilities such as Cloak room, Trolley & Porter Service, Radio Cab service, Wi-Fi at stations etc., would be available from day one. However, check-in and baggage facilities for both international and domestic passengers would not be available for the time-being.

India’s first Airport Express initially started its commercial operation on February 23, 2011. However, keeping in view passenger safety issues arising due to defects in civil structures, the services had to be suspended in July 2012. These defects have since been rectified by DMRC and the line was offered for re-inspection to the Commissioner Metro Rail Safety (CMRS) in December 2012. The line was inspected by CMRS on 15th and 16th January, 2013 and a formal clearance for commercial operation was received on January 18, 2013.

Reliance Infra Share Price

154.80 -3.25 (-2.06%)
05-Dec-2025 16:59 View Price Chart
Peers
Company Name CMP
NTPC 323.40
Tata Power 384.30
Adani Power 143.75
Power Grid Corp 269.75
Torrent Power 1284.50
View more..
Register Now to get our Free Newsletter & much more!

© 2025 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.

×