MoneyWorks4Me

IG Petrochemicals resumes production at Phthalic Anhydride Plant at Taloja

05 Feb 2013 Evaluate

IG Petrochemicals has restarted production at Phthalic Anhydride Plant at Taloja on February 01, 2013 and the operations have been stabilized. The company had shut this plant for approximately 15 days and the same is adequately insured.

IG Petrochemicals is a dominant player in the domestic Phthalic Anhydride (PAN) industry. IGPL has its manufacturing facilities located at Taloja, Maharashtra with an installed capacity of 1,16,110 metric tonnes per annum (mtpa) as on March 31, 2011.

Peers
Company Name CMP
Godrej Industries 1021.20
SRF 2490.00
BASF India 3411.40
Pidilite Inds. 1470.00
Tata Chemicals 607.90
View more..