JSW Energy’s arm gets LoA for 700 MW ISTS connected solar power project from NTPC

22 Apr 2024 Evaluate

JSW Energy’s wholly owned subsidiary -- JSW Neo Energy has received Letter of Award (LoA) for setting up 700 MW ISTS connected Solar Power Project from NTPC against Tariff based Competitive Bid invited for setting 1,500 MW ISTS-connected Solar Power Projects (NTPC-ISTS-II).

Subsequent to this, the Company's total locked-in generation capacity increases to 13.3 GW of which 3.1 GW comprises of Solar power. The Company’s current installed generation capacity is 7.2 GW and expects to have 9.8 GW of installed capacity by CY24.

JSW Energy has total locked-in generation capacity of 13.3 GW comprising of 7.2 GW operational, 2.6 GW under-construction across wind, thermal and hydro and LoA/LoIs for 3.4 GW capacity from SECI (Solar Tranche XIII and Wind Tranche XVI), SJVN, Gujarat Urja Vikas Nigam and NTPC. In addition, the company has 3.4 GWh of locked-in energy storage capacity through battery energy storage system and hydro pumped storage project. The company aims to reach 20 GW generation capacity and 40 GWh of energy storage capacity before 2030. JSW Energy has set an ambitious target of achieving Carbon Neutrality by 2050.

JSW Energy, part of the JSW Group, is a growing energy company. The Group has diversified interests in carbon steel, power, mining, industrial gases, port facilities, aluminium, cement and information technology.

JSW Energy Share Price

490.30 -9.60 (-1.92%)
09-Jan-2026 16:59 View Price Chart
Peers
Company Name CMP
NTPC 336.05
Tata Power 364.85
Adani Power 141.85
Power Grid Corp 258.55
Torrent Power 1320.75
View more..
Register Now to get our Free Newsletter & much more!

© 2026 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.

×