Tata Power, India’s largest integrated power utility has successful registered its 50.4 MW Wind power project at Gadag, Karnataka under Clean Development Mechanism (CDM) programme by United Nations Framework Convention on Climate Change (UNFCCC).
The 50.4MW wind plant at Gadag was commissioned in July 2009 and uses 63 wind turbine generators of 800KW capacity each to harness wind energy for power generation. The Gadag plant helps in reducing an annual average of 99,100 tonnes of carbon dioxide equivalent, by producing 107,064MWh per year (average) equivalent amount of clean energy.
Tata Power is India's largest integrated power company with a significant international presence. The Company has an installed generation capacity of 8521 MW in India and a presence in all the segments of the power sector viz. Generation (thermal, hydro, solar and wind), Transmission, Distribution and Trading