Adani Green Energy’s wholly-owned stepdown subsidiary -- Adani Renewable Energy Forty One has operationalized 250 MW of wind power project at Khavda, Kutchh, Gujarat. The plant has India’s largest and one of the world’s most powerful on-shore wind turbine of 5.2 MW capacity.
With this development, the total operational capacity at Khavda is 2,250 MW. Based on the relevant clearances, it was decided on July 24, 2024 to operationalize the plant and commence power generation from July 24, 2024.
Adani Green Energy builds, owns and operates power plants powered by renewable sources of energy like solar and wind.