Afcons Infrastructure has been declared as the lowest bidder for Construction Package BH-05 of Bhopal Metro Phase 1 project’s 12.915 km Blue Line (Line-2) which will connect Bhadbhada Chauraha - Ratnagiri Tiraha via 13 elevated stations.
This package by Madhya Pradesh Metro Rail Corporation (MPMRCL) includes the construction of the entire Blue Line’s viaduct, 13 stations, and a ramp leading to Subhash Nagar Depot which will be shared with Orange Line (Karond Circle - AIIMS) for maintaining and stabling. The bid project cost is Rs 1006.74 crore excluding GST. The completion period is 36 months.
Afcons Infrastructure is the flagship infrastructure engineering and construction company of the Shapoorji Pallonji group.