TCM has bagged work order from Mahindra Holidays and Resorts India for the Design, Supply, Installation and Commissioning of 250 KWp Grid connected SPV Power Plants at Club Mahindra Resort, Poovar. The broad consideration or size of the order is Rs 1.05 crore. The work is to be completed within 60 days.
TCM is engaged in the manufacture of of Potassium Chlorate – a vital raw material for the match Industry. In course of time the company diversified into a number of chemicals and established factories at Kalamassery in Kerala.