Adani Green Energy through its various wholly-owned stepdown subsidiaries has operationalized an aggregate 480.1 MW power projects at Khavda, Gujarat. With commissioning of these plants, the company’s total operational renewable generation capacity has increased to 14,217.9 MW.
Based on the relevant clearances, it was decided on March 29, 2025 to operationalize these plants and commence power generation from March 30, 2025.
Adani Green Energy builds, owns and operates power plants powered by renewable sources of energy like solar and wind.