CESC’s first 300 MW Thermal Power Unit of 2 X 300 MW project at Chandrapur, Maharashtra being executed by Dhariwal Infrastructure, a 100% CESC subsidiary, has been synchronised on September 02, 2013.
CESC, incorporated in 1978 as Calcutta Electric Supply Corporation (India), is engaged in power generation and distribution in state of West Bengal. CESC is a fully integrated power utility with its operation spanning the entire value chain: right from mining coal, generating power, distribution of power.