Waaree Renewable Technologies has informed that ‘Waareertl’ has been awarded Letter of Award (LOA) for the execution of Engineering, Procurement and Construction (EPC) works of solar power project of 300 MW AC/435 MW DC capacity. The details are required under Regulation 30 of the Listing Regulations read with SEBI Circular No. SEBI/HO/CFD/CFD-PoD-1/P/CIR/2023/123 dated July 13, 2023 is enclosed as ‘Annexure A’. Received intimation of the same on June 3, 2025 at 8:13 am (IST).
The above information is a part of company’s filings submitted to BSE.