L&T’s transportation infrastructure business secures order from NHSRCL

15 Sep 2025 Evaluate

Larsen & Toubro’s Transportation Infrastructure business vertical has secured a large order from the National High Speed Rail Corporation (NHSRCL) to construct 156 Route Km (RKM) of high-speed ballastless track (Package T1) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) Corridor. The scope includes design, supply, construction, testing & commissioning of track-works, on Design-Build Lump Sum Price basis, between Mumbai (Bandra-Kurla complex) and Zaroli village in Gujarat. This also includes over 21 km of track-works in underground sections (corresponding to Civil packages of C1, C2) and 135 km of track on the elevated viaduct sections (Pkg C3). 

This is the second track-work package that L&T has won in MAHSR. In April 2022, NHSRCL had awarded the Package T3 (116 km) from south of Vadodara city to Sabarmati depot to L&T and the project is progressing rapidly. With the latest order, L&T is now responsible for over 50% of the track-works in MAHSR. Japanese Shinkansen J Slab Track Technology is being adopted for the track-works, enabling up to 320 kmph speed, better ride quality, increased service life and maintainability.

Larsen & Toubro (L&T) is an Indian multinational engaged in technology, engineering, construction, manufacturing and financial services.

Larsen & Toubro Share Price

4005.20 16.15 (0.40%)
11-Dec-2025 16:59 View Price Chart
Peers
Company Name CMP
Larsen & Toubro 4005.20
Rail Vikas Nigam 311.85
NCC 161.00
KEC International 684.00
Kalpataru Projects 1167.05
View more..
Register Now to get our Free Newsletter & much more!

© 2025 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.

×