JSW Energy commissions 114 MW of renewable energy capacity in September

04 Oct 2025 Evaluate

JSW Energy has successfully commissioned 114 MW of renewable energy capacity in September 2025, with solar capacity of 21 MW and wind capacity of 93 MW, taking the installed capacity to 13,211 MW. With this the cumulative organic RE capacity addition during Q2 FY26 stands at 443 MW, which includes 20 MW of Floating Solar capacity at Vijayanagar. The share of renewables in the overall capacity stands at 57% constituting of wind capacity at 3,709 MW, solar capacity at 2,213 MW and hydro capacity at 1,631 MW. 

The company has total locked-in generation capacity of 30.5 GW comprising of 13.2 GW operational, 12.5 GW under-construction across thermal and renewable, 150 MW under acquisition hydro and has pipeline of 4.6 GW. The company also has 29.4 GWh of locked-in energy storage capacity through hydro pumped storage projects of 26.4 GWh and battery energy storage system of 3.0 GWh. The company aims to reach 30 GW generation capacity and 40 GWh of energy storage capacity by FY 2030 and achieve Carbon Neutrality by 2050.

JSW Energy, part of the JSW Group, is a growing energy company. The Group has diversified interests in carbon steel, power, mining, industrial gases, port facilities, aluminium, cement and information technology.

JSW Energy Share Price

470.50 -1.85 (-0.39%)
19-Dec-2025 10:21 View Price Chart
Peers
Company Name CMP
NTPC 318.05
Tata Power 375.45
Adani Power 141.55
Power Grid Corp 260.35
Torrent Power 1256.30
View more..
Register Now to get our Free Newsletter & much more!

© 2025 The Alchemists Ark Pvt. Ltd. All rights reserved. MoneyWorks4Me ® is a registered trademark of The Alchemists Ark Pvt. Ltd.

×