ACME Solar Holdings has informed that ACME Solar Holdings (‘ASHL’), through its wholly owned subsidiary, ACME Sun Power, has commissioned the first phase of 33.335 MW/160.48 MWh out of 300 MW/1400 MWh capacity of Battery Energy Storage System (BESS) Project located at Village: Badi Sid, Tehsil-Bap, Dist: Phalodi and Jodhpur, Rajasthan. The Commercial operation date (COD) for the above-mentioned phase-I shall be March 08, 2026.
The above information is a part of company’s filings submitted to BSE.