NTPC Green Energy’s wholly owned subsidiary -- NTPC Renewable Energy has commenced commercial operation of eighth and the last part capacity of 105 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat on May 28, 2026.
With this, the total installed capacity of NTPC Green Energy Group has increased to 10,621.40 MW.
NTPC Green Energy is a wholly owned subsidiary of NTPC, a ‘Maharatna’ central public sector enterprise. The company is mainly engaged in the activity of developing, building, owning, operating and maintaining utility scale grid connected solar and wind power projects (through O&M operations and in-house engineering).