Adani Green Energy through its stepdown subsidiaries -- Adani Green Energy Twenty Six A and Adani Renewable Energy Forty Three has commercially operationalized an aggregate 156 MW renewable energy projects at Khavda, Gujarat and an aggregate 185 MWh Battery Energy Storage System (BESS) projects at Khavda, Gujarat, respectively.
With commissioning of these projects, the company has achieved total operational renewable generation capacity of 20,141.80 MW and total operational BESS capacity of 3,551 MWh.
Adani Green Energy builds, owns and operates power plants powered by renewable sources of energy like solar and wind.