HBL Engineering has bagged an order from Integral Coach Factory (ICF), Chennai for Supply, installation, testing and commissioning of On-board KAVACH Loco equipment (Ver.4.0). The total value of the contract is worth Rs 31.49 crore (excluding 18% GST). The said contract to be completed on or before March 31, 2028.
HBL Engineering (formerly HBL Power Systems) is the pioneer in the design, development and manufacture of specialized batteries and DC systems in India. It has more than 30 years of experience in the field of specialized batteries and DC power systems.