MoneyWorks4Me

NTPC Green Energy’s arm to start commercial operation of 153.94 MW of Kalasar Solar Project

30 Sep 2026 Evaluate

NTPC Green Energy’s wholly owned subsidiary -- NTPC Renewable Energy is all set to commence commercial operation of the second and the third part capacity of 73.06 MW and 80.88 MW respectively of Kalasar Solar Energy Project, Bikaner, Rajasthan, out of 650 MW of Solar component under 500 MW REMCL RTC Project, with effective from October 01, 2026.

The current commercial capacity of NTPC Green Energy group stands at 11058.57 MW. With the addition of this capacity, the total installed capacity of the NTPC Green Energy group increases to 11,212.51 MW.

NTPC Green Energy is a wholly owned subsidiary of NTPC, a ‘Maharatna’ central public sector enterprise. The company is mainly engaged in the activity of developing, building, owning, operating and maintaining utility scale grid connected solar and wind power projects (through O&M operations and in-house engineering).

Peers
Company Name CMP
NTPC 319.95
Tata Power 358.40
Adani Power 202.15
Power Grid Corpn. 258.50
Adani Energy Solut. 1317.45
View more..