ACME Solar Holdings (ASHL), through its wholly owned subsidiary, ACME Greentech Seventh, has additionally commissioned Battery Energy Storage System (BESS) component, comprising 52.32 MW / 209.28 MWh out of 300 MW / 1200 MWh (Discharge Capacity) of the FDRE Project located at Village Kelan, Tehsil Chhatargarh, District Bikaner, Rajasthan, on November 17, 2026. The Commercial operation date (COD) for the same shall be November 19, 2026.
With this, ACME Greentech Seventh has achieved cumulative commissioned capacity of 247.67 MW / 990.68 MWh (Discharge Capacity) of the BESS component with total installed capacity of 247.67 MW / 1321 MWh. Power Purchase Agreement (PPA) for this project has been signed with SJVN.
ACME Solar Holdings is a renewable energy company in India with a portfolio of solar, wind, hybrid and firm and dispatchable renewable energy (FDRE) projects.