G R Infraprojects’ wholly owned subsidiary -- GR Madanapalli Pileru Highway has executed the concession agreement with the National Highways Authority of India (NHAI). The project is for Construction of Four Laning of NH-71 from Madanapalli (Design Km 0.000/Existing Km 0.000) to Pileru (Design Km 55.900/Existing Km 59.250) (Design Length= 55.900 Km) Package-1 on HAM Mode in the State of Andhra Pradesh under Bharatmala Pariyojna. The bid project cost is Rs 1577 crore. Completion period of the project is 730 days from appointed date and operation period is 15 years from commercial operation date.
G R Infraprojects is an integrated road EPC company with experience in design and construction of various road/highway projects across many States in India.