Bharat Heavy Electricals (BHEL) has received an order from NHPC for Design, engineering, manufacturing, supply, erection and commissioning of Electro-Mechanical package involving Turbine, Generator, Digital Governing System, Static Excitation System, Transformers, Bus Reactors, Gas Insulated Switchgear, Outdoor Pot yard & Switchyard Equipments and Electrical & Mechanical BoPs for 12x240 MW Electro-Mechanical Works of Dibang Multipurpose Project at Roing in Arunachal Pradesh. Major equipment for the contract will be manufactured by BHEL’s plants at Bhopal, Bangalore, Jhansi and Rudrapur. The on-site execution activities will be carried out by the company's Power Sector - Eastern Region division, Kolkata. Broad consideration or size of the order(s)/contract(s) is Rs 2241.86 crore excluding taxes. The said order is expected to be completed in 75 months.
BHEL is India’s largest engineering and manufacturing company of its kind. It is a power plant equipment manufacturer and operates as an engineering and manufacturing company.