Airfloa Rail Technology has received new order of worth Rs 2.55 crore on May 27, 2026 from Integral Coach Factory, Chennai of Indian Railways for supply and installation of One Coach Set of Roof Assembly for LWS/BW2 (752) Shells for FRP Panel features. The order is expected to be completed within a period of 22 months.
Airfloa Rail Technology is engaged in the manufacturing of components which are used in the rolling stock for the Indian Railways through railway production units like Integral Coach Factory (ICF), other coach factories.