GPT Infraprojects’ wholly owned subsidiary -- Alcon Builders and Engineers has been declared L1 (First Lowest) in order valued at Rs 120.95 crore by NER HQ-S and T/North Eastern railway. The order involves design, programming, installation, supply, testing and commissioning of electronic interlocking (EI) system conforming to RDSO Specification No.RDSO/SPN/192/2019 or Latest (With Latest Amendment if any) as per SIP along with Indoor & Outdoor Work (Replacement and augmentation of outdoor signaling gears) including part supply of materials at (CRV, MND, ORW, BST, GOVR, TH, GAUR, BV, PATI, SNC, MSW, LKNR, JLHI, MOTG, BRCK, BUR & JBR) (Centralized Type) Stations and Mankapur Station (Distributed 1+2 Type) in between GKP-LJN Section, Automatic Block Signaling work in BBK-JBR-BUR-BUW Block Section with EI at huts (27.13 Km) and work for 2 OFC cables of 48 fibers (96 fibers) on each side of the track in between BBK-BUW section, GD -KLD Section and DMG-GKC Section in Lucknow Division of N.E.Railway.
GPT Infraprojects, the flagship company of the GPT Group is a premier Infrastructure company based out of Kolkata, India.